Friday, October 18, 2024
newStone - We will update latest news around the world. newStone is leading digital news website in Telugu.
Nadu Nedu Painting Works Certain Insructions

Firki Maths TPD Blended Course Test Quiz Questions and Answers

Firki Maths TPD Blended Course Test Quiz Questions and...

Download School Attendance App Updated App Version

School Attendance App Updated - Download School Attendance App...

newStone Scripts and Projects and Tools

newStone Scripts and Projects and Tools created for teacher,...

APTET 2024 Hall Tickets Download [Released] AP TET Admit Cards Direct Link aptet.apcfss.in

APTET 2024 Hall Tickets Download - APTET 2024 Sep...

🗣️ తల్లిదండ్రులకు, ఉపాధ్యాయులకు, విద్యార్ధులకు ముఖ్య గమనిక. 📻 మీరు లేదా మీ పిల్లలచే రూపొందించ బడిన కథలు, పద్యాలు, నాటికలు, పాఠాలు, స్పోకెన్ ఇంగ్లీష్.. ఇతరాలు మా ఆన్లైన్ రేడియో లో ఉచితంగా ప్రసారం చేయబడును. దీనికి గాను మీరు రూపొందించిన ఆడియో ఫైల్ ను ఏ విధమైన బాక్ గ్రౌండ్ నాయిస్ లేకుండా మాకు 9493308090 నంబర్ కు టెలిగ్రాం యాప్ ద్వారా పంపండి. ఆడియో ఫైల్ ప్రారంభం లో మీ పేరు, ఊరు వంటి వివరాలు చెప్పి, మీరు చెప్పాలనే అంశం పేర్కొని ఆడియో ఫైల్ పంపండి. తదుపరి ప్రసారం చేసే సమయం మీకు తెలియ చేస్తాం. రేడియో ప్రసారాలను newstone.in యొక్క ప్రతి లింక్ మీద వినవచ్చును

Nadu Nedu Painting Works Certain Insructions

WhatsApp Channel Join Now
Telegram Channel Join Now
Google News Follow Us

Nadu Nedu Painting Works Certain Insructions

GOVERNMENT OF ANDHRA PRADESH SCHOOL EDUCATION DEPARTMENT

Circular .Rc.No. 1956769 /MBNN/2022,                     Dated.09/01/2023

nadu nedu painting works certain insructions

Sub:-    Mana  Badi Nadu  –Nedu   –  Certain  instructions  to Head Masters     –  on Painting –   issued-Reg.

Ref:      Decisions taken  in the review meeting held with TSU (Technical Support Unit), APEWIDC  and CPM Vendors  of  Drinking Water Systems  and Paint companies.

@@@@

As part of Mana Badi Nadu Nedu in Phase-I   Progamme  painting was taken up in all the  Schools as part of  the 10 components of  the programme. Several complaints, reports and feedback from the Inspecting Ofcers and reports from Nadu Nedu PMU reveal that painting done in some Nadu Nedu Schools is peeling off  as  several  instances  of   the  painting  being    done  without  proper  surface preparation such as Scraping and High pressure cleaning has come to light.

At  few places,the  quality  of  Painting  is not  upto  the  mark  and  there  is visible deterioration  in  the form of  peeling,  blotches  on the surface  and fading, the painting quality will not be able to hold up for  the guarantee period of 7 years given by the Painting Companies.

These issues were discussed  in detail in the review meeting with the Paint companies and the following decisions are taken:

Starting  from  10.01.2023,  the  two Painting  Companies  Berger  and  Asian Paints will  visit all the  Schools, Painted by them under Phase-I and  identify the Schools where repainting of walls, rooms, doors and windows is required.

The concerned Head Master, Field Engineer (who supervised the work in Phase-I)  and the company representative  will  go around  the School and identify the areas to be repainted.

Once the  areas  are  identifed  the  companies  shall  take  up  painting  and complete  the same  by end of  February-2023.  While  taking  up Painting  if  the existing  wall   arts,  labels  and  sign  boards  are  disturbed  the  same  shall  be repainted.

All the DEO’s  / APC’s  shall  ensure that the Head Masters,  Field Engineers are  available   when  the  company  representatives   are  inspecting   the  school premises.

The  DEO’s   /   APC’s   may  please  ensure   that   the  Field  Engineers  who supervised  the works in Phase-I shall supervise this activity personally and certify the rectifcation work along with the Head Master.

After  doing  the rectifcation  the painting  companies  can take back the balance painting material stocked in the Schools.

On completion  of  the Painting  work the Head Master,  Field Engineer  and the  company will   certify   the  quality   of   painting   and   sign   the  declaration confrming the quality of the painting, and the same will be uploaded to STMS.

After completion of certifcation by the Head Master and Field Engineer and the Company representative, Cross Audit will  be taken up by sending special teams drawn from one District to another  to inspect the quality of painting and re-certify the Painting quality.

Wherever Painting  quality  after  rectifcation  is also  found to be poor, the cost would be recovered from the concerned staff   and Field Engineers who have certifed the painting..

All the DEO’s  /  APS’s  are requested  to ensure  that  the Head Masters are available  during  the  identifcation  of   areas  to  be  repainted  and  during  the repainting work.

The MD, APEWIDC will coordinate  with the painting  companies  and ensure that the repainting of all needy Schools   is completed by end of February-2023.

Download Proceedings and Format

MANABADI :: NADU-NEDU, PHASE-I

CERTIFICATE OF PAINTING

DISTRICT: ……………………………………………. MANDAL: ………………………………………….. SCHOOL: …………………………………………… UDISE CODE: ………………………………….

Name of the Vendor: …………………………………………………………………………………………                                                                                      Date: ………………………………..

Sl.

No.                   Component

Condition / status of

component                                                                                         Remarks

1       Internal Walls                            Good                              Yes

No

If No, Repairs are to be attended: …………………………………………………..………………….

….………………………………………………..………………………………………………..………………………

………………………………………………………………………………………………………………………………

2       External Walls                           Good                              Yes

No

If No, Repairs are to be attended ……………………………………………………..………………….

….………………………………………………..………………………………………………..………………………

………………………………………………………………………………………………………………………………

3       Doors                                          Good                             Yes

No

If No, Repairs are to be attended: …………………………………………………..………………….

….………………………………………………..………………………………………………..………………………

………………………………………………………………………………………………………………………………

4       Windows                                    Good                              Yes

No

If No, Repairs are to be attended: …………………………………………………..………………….

….………………………………………………..………………………………………………..………………………

………………………………………………………………………………………………………………………………

5       Compound Wall                        Good                              Yes

No

If No, Repairs are to be attended: …………………………………………………..………………….

….………………………………………………..………………………………………………..………………………

………………………………………………………………………………………………………………………………

6       Iron Grills / Grill Gates             Good                              Yes

No

If No, Repairs are to be attended: …………………………………………………..………………….

….………………………………………………..………………………………………………..………………………

………………………………………………………………………………………………………………………………

This is to certify that all the defects identified are rectified to our satisfaction and the works are complete in all respects.

HM                                                                                Mandal Engineer                                          Company Representative / Technician

SEAL                                                                                   SEAL                                                                                    SEAL

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

You may like this